Name |
STEKON waste-water treatment facility |
Effective volume, m3 |
|
Outer diameter, mm |
1 100-3 000 |
Structural design |
Horizontal, vertical, above-ground, underground |
Temperature of operating medium, °C |
+2 to + 60 |
Type of climatic version |
UHL as per GOST 15150 |
Rated service life, years |
At least 25 |
Optional equipment |
Pump equipment, pipes and check-valves systems, maintenance elements (manhole, ladder, service platform, fencing, box for garbage, etc.), devices for controlling liquid level, pouring in and discharging liquid, for Extreme North regions – block-modular buildings, heating cable, additional thermal insulation. |
A sewage pumping station is cylinder-shaped body with inside inbuilt basic pumping equipment, outfitted with piping, check valves, maintenance elements (manhole, ladder, service platform, fencing, box for garbage, etc.), control cabinet for pumping equipment.
Basic parameters of a sewage pumping station
Throughput rate, m3/h |
1 to 2 000 |
Diameter of body |
1.1 to 4.2 m (1 100 to 4 200 mm) |
Flow rate of pumps, m3/h |
1÷2 000 |
Pump head. m |
Up to 70 |
Diameter of pressure conduit, mm |
Up to 600 |
Capacity of pump drive, kW |
Up to 80 |
Seismic rating of a construction site |
Up to 7 points |
Basic versions ofsewage pumping stations
Property |
Periodically acting sewage pumping stations immersed pumpsof low and middle throughput rate |
Periodically acting sewage pumping stations immersed pumpsof high throughput rate |
Material of body: glass fiber-reinforced plastic with inequal wall thickness |
Maximum number of pumps |
3 |
3 |
Maximum throughput of sewage pumping station, m3/h |
10 - 150 |
160 - 1 600 |
Diameter of sewage pumping station, mm |
1 100 - 2 400 |
2 000 - 4 200 |
Application area of sewage pumping station |
Pumping over service-utility waste waters from industrial enterprises, field camps, private housing (first and second stage) |
Pumping over service-utility drains from city micro-districts (up to 30 000 inhabitans), habitable territories and manufacturing sites (first stage) |
|